Project supply:
Gas and liquid Gas Refinery Complex 1200:
Gachsaran Associated Sour Gas- average capacity 260 million cubic feet per day.
Gas and Liquid Gas Refinery Complex 1300:
Bibihakimeh, Ragsefid, Binak and environs Associated Sour Gas- average Capacity 180
million cubic feet per day, and Unstabilized Gas Liquid from Siahmakan Slugcatcher- average capacity 4900 barrels per day.
Licence owner and principal engineering :
- Engineering services of British Costain Company is used for Liquid gas refinement from
sulphure combinations.
- Sulfrex Process is under Licence of French IFP Company.
- Contractor of Basic and Detailed engineering, procurement and execution in EPC method
is the Oil industries Construction & Engineering Company.
- Investment: 204 million us Dollars.
Refinery Complexes of Gas and Liquid gas 1200/ 1300 will consist of the following units:
Gas sweetening unit, Gas liquid recovering unit, Polishing unit, Acid gas Compression
unit, Utility unit, Transmission Lines and high voltage substations, and pipelines for
transfer of products to Bandar Imam Petrochemical Complex.
Product capacity of the project:
1) Refinery complex 1200:
- 26500 barrels average of Sweet gas liquids per day, which will be delivered to Bandar
Imam Petrochemical Complex as part of its needed raw material.
- 219 million cubic foot average per day of Light gas, to be delivered to Gachsaran oil field
via Gachsaran Gas Injection station.
2) Refinery complex 1300:
- 20600 barrels average of Sweet gas liquids per day, which will be delivered to Bandar
Imam Petrochemical Complex as part of its needed rawmaterial.
- 152 million cubic foot average per day of light gas, to be delivered to Bibihakimeh oil
field via Siahmakan Gas injection station.
|
|